In Part 1 of my series I wrote about the Third Main between Westfield & Wiri as being an ATAP (Auckland Transport Alignment Project) ASAP, a first decade project that in my opinion needed funding straight away, my second post of this series is about the need for extra trains pre-CRL (City Rail Link).

Currently we have 57 three-car trains and anyone who uses trains on a regular basis will have seen the massive growth in patronage. People at peak report crowded trains, as well people in some shoulder peak services in which some services are only three-car trains instead of six. Even I have noticed it the 5:58am from Avondale which is no longer a very empty train. But don’t take my word for it, the patronage figures speak for themselves.

By allowing for more efficient operations, the CRL will improve capacity but that is not due to be finished until 2023which means we have a long way to go & a lot of growth needing to be accommodated.

ATAP states that three tranches of 21 extra trains are needed over the 30-years between 2018-2048, one tranche per decade. In order to cope with the growth we’re already seeing, let alone what the CRL will deliver, we really need to order the first tranche of additional trains now. That will allow Auckland Transport to run more services as six-car trains, ensuring that all peak and shoulder peak trains are appropriately bulked up, especially in the afternoons where trains are used for school students.

Rail Development Programme

It is imperative we order the trains sooner rather than later as the trains have about a 2 year lead time, meaning if we ordered them today they still wouldn’t arrive until late 2018, by which time services will be significantly more crowded. Of course trains don’t come cheap and each one costs around $10 million and ATAP budgets $210 million for each of the first two tranches. We also know that AT have been looking at the idea of buying some battery powered trains to allow them to serve Pukekohe without needing wires.

Regardless, the network is growing like crazy and we need the capacity to get through to the CRL. Add in the long lead times for production and that we’ll definitely need them once the CRL opens and I think we have ourselves an ATAP ASAP.

I have an extra set, but it may still have capacity issues :D
I have an extra set, but we may still have capacity issues 😀

So what do you think?

The post ATAP ASAP’s – Extra Trains appeared first on Greater Auckland.